top of page

Honored to Partner With

HSB_logotyp_Pos_RGB_PNG 1.png
Logo_ljungbybost_vit.png
Logo_Junehem_blue_CMYK.png
Enköpings Hyresbostäder.png
Aefab_logga_transparent.png

Care free Pipe 

Renovation projects

Clear And effective communication for your tenants and contractors

Book An Introductory meeting

A Few Clients Challenges

Frame 1000002916.png

The Checklist

The first (and perhaps only) thing you need is to verify that you’re on track, and you can do that with this Pipe Renovation Communication Checklist

Frame 1000002916 (1).png

The Timeline

A Timeline that roughly shows when to launch your information campaign and its various stages—especially to ensure good timing with the construction project itself.

Frame 1000002916 (3).png

The Vision

Read more about how to create a Vision Outline.

Frame 1000002916 (2).png

The Target Audience  

A Target Audience Analysis that you can use as inspiration for how to reach your tenants.

Frame 1000002944 (4).png

Setup for success!

Check out our free resources

No one wants to fail with their pipe renovation project, and our specialty is communication. That’s why we always aim for visitors to this site to get help, whether they are customers or not. Below, you’ll find the basics we work with during our preliminary studies, which you can also use yourself.

A Few Clients Challenges

(Swipe to see more quotes)

(Swipe to see more quotes)

(Swipe to see more quotes)

fi-br-quote-right.png
Avtre really took a creative approach with the suggestion to make a simple film of the presentation. We didn’t need anything more advanced at that moment." / Enköping Hyresbostäder
fi-br-quote-right (1).png
fi-br-quote-right.png
"The trust! That feeling when you know it's not just seller and buyer." / Boxholmshus
fi-br-quote-right (1).png
fi-br-quote-right.png
"Everything was well thought out before we started. All we had to do was go to our print shop to create the signs with the QR codes and put them up outside the waste rooms." / Ljungbybostäder
fi-br-quote-right (1).png
fi-br-quote-right.png
"We just needed to provide input on the details, and they took care of the rest." / JuneHem
fi-br-quote-right (1).png
fi-br-quote-right.png
"We were up against a tight deadline, and they delivered in four working days, something that usually takes months. Professional and fast." / Partillebo
fi-br-quote-right (1).png
Vector 7 (1).png
Frame 45.png

Introductory Meeting

We start with an Introductory Meeting (30 min)where we introduce ourselves. If it feels right, we decide together whether to schedule an "inspiration Meeting".

Vector 7 (1).png
Frame 45.png

Inspiration Meeting

In the Inspiration Meeting (60 min), we go through your and your colleagues' thoughts and discuss your situation and circumstances.

Frame 45 (1).png

Service Decision

You/your team highlight if there’s anything you want us to provide a quote for, or if a preliminary study would be more suitable for you.

Vector 7 (1).png
Frame 45 (2).png

Deliver you need

We deliver what you need and support your communicator to ensure a successful pipe renovation project where all employees feel proud and satisfied.

Vector 8.png
Vector 8.png
Vector 8.png
Frame 1000002916.png

The Checklist

The first (and perhaps only) thing you need is to verify that you’re on track, and you can do that with this Pipe Renovation Communication Checklist
Frame 1000002916.png

The Timeline

A Timeline that roughly shows when to launch your information campaign and its various stages—especially to ensure good timing with the construction project itself.
Frame 1000002916.png

The Vision

Read more about how to create a Vision Outline.
Frame 1000002916.png

The Target Audience  

A Target Audience Analysis that you can use as inspiration for how to reach your tenants.

Our 4 Step Process To Help Our Clients

Case Studies: How We Made a Difference

Logo_Junehem_blue_CMYK.png

EHB

The Customer

EHB (Enköpings Hyresbostäder)

The Problem

The projectinformation was only available in writing and in a PowerPoint presentation. How can the information be made accessible in an easy way?

The Solution

We made the ppt-presentation into a movie, complete with multiple subtitles

Quote

"Avtre really took a creative leap with their suggestion to make a simple video of the presentation. We didn't need anything more advanced at that time."

"I have a the same problem and I might want a similar solution"

Watch the video here!

We can do the same for you! 

Contact us!

Frame 22 (1).webp

The customer had observed that there were many tenants who did not attend the meeting that provided information about the project. The information about the project was only available in writing and in a PowerPoint presentation. How can the information be made accessible in an easy way? Well, by producing a film of the presentation!

Logo_Junehem_blue_CMYK.png

Partillebo

The Customer

Partillebo

The Problem

Lack of time

The Solution

A video template that is edited for the purpose and can be delivered within 10 working days.

Quote

"We were up against a tight deadline, and they delivered in four working days, something that normally takes months. Very professional!"

"I have a the same problem and I might want a similar solution"

This video is available as a template. Watch the edited template here:

Frame 22 (1).webp

The project was to renovate an 80s bathroom. The planning had been done, the tenants had been called to a meeting, but due to miscommunication internally, there was a lack of time to get the information materials ready.

Logo_Junehem_blue_CMYK.png

Aefab

The Customer

Aefab (Alfta-Edsbyns Fastighets AB)

The Problem

They are receiving too many calls about their plumbing renovations. So many that it’s affecting the entire operation. Even the carpenters carrying out the renovation need to answer support calls.

The Solution

An animated video to refer to. The film explains the most important information tenants need to know ahead of upcoming plumbing renovations.

Quote

"Everyone has seen the film and thinks it's really nice. Well done, everyone is very happy!"

"I have a the same problem and I might want a similar solution"

This video is available as a template. Watch the edited template here:

Frame 22 (1).webp

Alfta-Edsbyns Fastighets AB (Aefab) was in the middle of a plumbing renovation phase when we started our dialogue. During the discussion, the following issue was identified: The carpenters were receiving many calls with questions about the plumbing renovation.

We produced an animated film explaining the most important information that tenants need to know ahead of the upcoming renovation.

Would you like to know more about animated informational films? Contact us:

Logo_Junehem_blue_CMYK.png

Junehem

The Customer

Junehem

The Problem

Communication issues between tenants, the company, and the contractors

The Solution

An animated video that explains the entire process.

Quote

"We just needed to provide input on the details, and they took care of the rest."

"I have a the same problem and I might want a similar solution"

This video is available as a template. Watch the edited template here:

Frame 22 (1).webp

A plumbing renovation project was contracted, but had to be halted due to communication issues between tenants, the company, and the contractors. It’s time to redo it, get it right, and take it to the next level.

Group 25.webp

About Us

We help our clients feel secure and effective in their dialogue with staff, tenants, suppliers, and management groups. We create routines and structure, followed by targeted communication efforts where we assist the communications manager with support, smart solutions, and ready-made templates for web and video.

400+

customers in 2023

7000

Film production hours

30,000

development hours

Flexible Services to Meet Your Unique Needs

Whether you know exactly what you need, such as a film, website, or printed materials—or if you want support during the project—we have what you need. We offer ready-made video templates that we edit to suit your needs, we have web components and technical expertise to make life easier during the project.

What we can do for you:

Frame 1000002934 (2).png

Video Templates

  • Ready-made film

  • Rebranding with your logo and colors

  • Customizable to fit your requirements

Or perhaps you'd like us to redesign your PowerPoint presentation?
Link to example

Frame 1000002934 (2).png

Webb Templates

  • Ready-made templates

  • Rebranding with your logo, colors, and shapes

  • 8 sections, including FAQ

Frame 1000002934 (2).png

Print Materials

  • Ready-made templates for tenant communications

  • Rebranding with your logo, colors, and shapes

  • Customized to meet your needs

  • Links to created film or website via QR codes.

Frame 1000002934 (2).png

Preliminary Study

(So you feel confident with the approach)

  • Overall Timeline

  • Proposed actions in a "to-do list" with descriptions

  • Activity plan (combined timeline and to-do list)

  • Packaged in a ready-made presentation to show the steering group or other stakeholders

Preliminary-study: Approximately 15,000 SEK

Frame 1000002934 (2).png

Complete Project

  • Preliminary study

  • Execution

  • Follow-up, and evaluation

Frame 1000002934 (2).png

Additional Services

  • Basic brand profile

  • SMS distribution

Preliminary Study & Project: What’s Included?

We help ensure you have a good starting point, but most importantly, we provide security for your communications manager in their upcoming work.

Frame 1000002916.png

What do we have, what must we address, what would be good to do?

Frame 1000002916.png

When should we start our communications, what needs to be prepared beforehand, etc.

Frame 1000002916.png

In a perfect world with unlimited resources, how would we do this?

What does a preliminary study include?

The preliminary study consists of three structured online meetings with one of our project managers. After completing the study, you will receive:

Frame 22 (2).webp
fi-br-quote-right (1).png
fi-br-quote-right.png
Avtre really took a creative approach with the suggestion to make a simple film of the presentation. We didn’t need anything more advanced at that moment." / Enköping Hyresbostäder
fi-br-quote-right (1).png
fi-br-quote-right.png
"The trust! That feeling when you know it's not just seller and buyer." / Boxholmshus
fi-br-quote-right (1).png
fi-br-quote-right.png
"Everything was well thought out before we started. All we had to do was go to our print shop to create the signs with the QR codes and put them up outside the waste rooms." / Ljungbybostäder
fi-br-quote-right (1).png
fi-br-quote-right.png
"We just needed to provide input on the details, and they took care of the rest." / JuneHem
fi-br-quote-right (1).png
fi-br-quote-right.png
"We were up against a tight deadline, and they delivered in four working days, something that usually takes months. Professional and fast." / Partillebo
Frame 22 (3).webp

What does a project include?

A project includes a preliminary study, and from there, we work together to fill the gaps that suit your needs and align with your pipe renovation project. The budget for the communication costs of a pipe renovation project is approximately 600 SEK per apartment to be renovated within the next 5 years. The cost can be handled internally or externally.

Steps:

We’ve Got You Covered!

Do you have these problems?

Frame 1000002943 (1) (1).webp
Frame 1000002947.png

Let's connect and make your project a success

© 2024 by Avtre AB

Facebook
Linkedin
Book Meeting
Avtre_Logo_Liggande_färg_RGB_Liten_edited.png
Resources
Our Process
Case Studies
Services
About Us
bottom of page